2021 typical fees:
At C&M Engineering, we prefer to offer our fees inclusive of our entire scope of work. No hidden fees for filling out the paperwork, no extra markup on water samples or moa fees. We will beat a written quote to work for you! The below fees are estimates and subject to change on a project to project basis.
COSA - Septic only $750. Includes research, testing, COSA preparation, etc. Does not include septic pumping, asbuilt survey (if needed), or MOA COSA fee).
COSA - Well Only $750. Includes research, testing, water samples, COSA preparation, etc. Does not include MOA COSA fee ).
COSA - Well and Septic $1250 Includes research, testing, COSA preparation, etc. Does not include septic pumping, asbuilt survey(if needed), or MOA COSA fee($526).
Design/Permit - Septic system, within MOA. $1500-$2000. Includes: soils exploration, design, permit application, inspection, record document preparation, and waiver requests (if necessary). This includes Advanced waste water treatment system designs. Does not include municipal permit or waiver fees.
Design/Permit - Septic Tank Only, within MOA $500-$750, includes design, permit, inspection, and record document preparation. Does not include MOA permit fee.
Well Permit, within MOA - $0 - $200. No charge if included with septic design/permit. $200 for well only permit, includes site plan and permit application. Does not include MOA permit fees.
Design/permit for commercial systems - Call us
Design/Document -Septic, Wasilla/Palmer $500 - $1000 for typical residential septic systems.
Additional Services: Call us, we'll take a look at your project and offer a fair price to do the work.
Contact us: 907-854-5558
COSA - Septic only $750. Includes research, testing, COSA preparation, etc. Does not include septic pumping, asbuilt survey (if needed), or MOA COSA fee).
COSA - Well Only $750. Includes research, testing, water samples, COSA preparation, etc. Does not include MOA COSA fee ).
COSA - Well and Septic $1250 Includes research, testing, COSA preparation, etc. Does not include septic pumping, asbuilt survey(if needed), or MOA COSA fee($526).
Design/Permit - Septic system, within MOA. $1500-$2000. Includes: soils exploration, design, permit application, inspection, record document preparation, and waiver requests (if necessary). This includes Advanced waste water treatment system designs. Does not include municipal permit or waiver fees.
Design/Permit - Septic Tank Only, within MOA $500-$750, includes design, permit, inspection, and record document preparation. Does not include MOA permit fee.
Well Permit, within MOA - $0 - $200. No charge if included with septic design/permit. $200 for well only permit, includes site plan and permit application. Does not include MOA permit fees.
Design/permit for commercial systems - Call us
Design/Document -Septic, Wasilla/Palmer $500 - $1000 for typical residential septic systems.
Additional Services: Call us, we'll take a look at your project and offer a fair price to do the work.
Contact us: 907-854-5558